Welcome to our FESCOBill.PK Website! Electricity is the backbone of our modern lives, and if you’re looking to get a new electricity connection, FESCO has made the process smoother than ever. In this blog post, we’ll guide you through each step of the FESCO new connection application process, ensuring a hassle-free experience. Whether you’re a seasoned applicant or new to FESCO, this article serves as your comprehensive guide. From submitting your FESCO online application to understanding the importance of FESCO new connection demand notices and tracking your progress, we have you covered. So, if you’re ready to power up your world with a FESCO New Connection, let’s dive in!

Procedure for Obtaining a FESCO New Connection Online:

We’ve provided a detailed, step-by-step guide, complete with illustrative images, to help you navigate the process of installing a new connection. Before starting your application, ensure you have the following prerequisite documents ready:

  • Copy of the neighbor’s FESCO electricity bill
  • Copy of the property document
  • Attested CNIC copy of the applicant
  • Attested CNIC copy of the witness
  • Wiring contractor’s test report

Note: For optimal performance, it is recommended to submit the application form using a desktop or laptop.

Step-by-Step Guide:

  1. Visit the ENC Portal Website: Start by navigating to the official FESCO ENC portal.
  2. Click “Apply”: On the left side of the webpage, click the “Apply” button.
  3. Enter the Reference Number: Fill in your neighbor’s consumer reference number. The system will automatically retrieve relevant details such as the neighbor’s name, address, and distribution company’s information.
  4. Select the Electrical Load: Choose the type of electrical load you need based on your usage. For residential use, selecting a load of up to 15KW is typical.
  5. Choose the Connection Type: Select the type of connection you require (e.g., Domestic, Commercial, etc.).
  6. Complete the Online Form: Fill in your personal details, including whether you’re the landlord or tenant, and your CNIC information.
  7. Submit Contact Information: Provide the contact details of the person obtaining the connection.
  8. Confirm Premises Details: Double-check and confirm details about the premises, including any existing meters and required load.
  9. Declare Appliance Details: List the appliances you plan to use, specifying the quantity and wattage for each.
  10. Attach Required Documents: Upload the necessary documents, such as CNIC and property ownership proof.
  11. Review and Submit: Carefully review all provided information, agree to the terms, and submit the application.

Procedure for Obtaining a FESCO New Connection Offline:

If you prefer to apply offline, here’s what you need to do:

  1. Get the Application Form: Visit your nearest FESCO Customer Service Center or download the form from the FESCO website.
  2. Fill in the Form: Accurately complete the form with all required details.
  3. Attach Documents: Include necessary documents such as your CNIC, a recent electricity bill, and proof of property ownership.
  4. Submit Your Application: Submit the completed form and documents at the FESCO Customer Service Center.
  5. Feasibility Study: FESCO will conduct a study to check the feasibility of the connection and determine the required load.
  6. Receive an Estimate: After the feasibility study, FESCO will provide a cost estimate.
  7. Make Payment: Pay the connection fee and security deposit as per the instructions.
  8. Connection Setup: FESCO will set up your new connection within the agreed timeframe.

Note: The process may vary depending on the type of connection and load requirement.

Required Documents for New FESCO Meter Connection

Ensure you have the following documents ready when applying for a new meter connection:

  • National Identity Card (NIC): A valid copy of your NIC.
  • Proof of Ownership: Documents confirming ownership of the property.
  • Additional Documents: Any extra documents required for commercial connections.

FESCO New Connection Application Form

The FESCO new connection application form is vital in the process. This form collects your essential details, such as your name, address, contact information, and load requirements. It’s crucial to fill out this form accurately and attach all necessary documents, including a CNIC copy and property documents.

New Meter Connection Status

Track the status of your new meter connection application online via the FESCO website. Simply enter your unique application reference number to receive real-time updates on your application’s status.

FESCO Demand Notice Tracking

After submitting your application, FESCO will issue a demand notice that includes the connection fee and associated charges. To track your demand notice, use your 14-digit reference number on the FESCO website. This tool provides real-time updates on whether your demand notice is pending, approved, or requires action.

FESCO Online Application Tracking

Upon submitting your new connection form, you will receive an application tracking number. Use this number to monitor the status of your application through the ENC portal. This tracking system keeps you informed every step of the way.

FESCO Demand Notice Fee 2024

The FESCO demand notice fee is calculated based on fixed and variable charges, which depend on factors like service line length, connection type, and location. Below is a breakdown of the fees for 2024:

Connection TypeLength of Service LineFee (PKR)
Single Phase (Rural)Up to 40 meters4,000
Single Phase (Urban)Up to 40 meters4,000
Three PhaseUp to 40 meters15,000

Note: Rates may vary based on market prices.

How to Download and Print FESCO Demand Notice

Follow these steps to download and print your FESCO demand notice:

  1. Visit the ENC Portal: Navigate to the ENC Portal.
  2. Generate FESCO Demand Notice: Click “Print DN” and select the application type as “new connection.”
  3. Input Tracking Number: Enter your tracking number and click “Submit.”
  4. Retrieve Demand Notice: Download or print the demand notice and ensure timely fee submission.

How to Submit FESCO Demand Notice Online

To submit your demand notice online, ensure you have a scanned copy of the paid notice and follow these steps:

  1. Visit the ENC Portal: Head to the ENC portal.
  2. Upload Scanned Copy: Select “new connection,” enter your tracking number, and upload the scanned copy of the notice.
  3. Submit and Wait: After submitting, your new connection will be installed within 15 days.

Conclusion

Obtaining a FESCO new connection is a streamlined process, especially with the help of the ENC portal. By following the steps outlined above and ensuring all prerequisites are met, you can secure your new connection efficiently. Make your connection process hassle-free with FESCO today!

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *